UMR435T

Video

Starting engine UMR435/425
01:40
Stopping engine UMK435/425
00:30
Trimming UMK435/425
02:11

Slideshow

Pre-Operation Check 1 (Engine Oil) 5 pages 1.60 MB
Pre-Operation Check 2 (Fuel Level) 7 pages 2.18 MB
Pre-Operation Check 3 (Air Cleaner) 7 pages 2.66 MB
Pre-Operation Check 4 (Throttle cable) 10 pages 3.37 MB
Pre-Operation Check 5 (Nylon-line Cutting Head) 9 pages 3.14 MB
Pre-Operation Check 6 (Cutting Blade) 9 pages 3.10 MB
×
To provide you with better content, we would appreciate your cooperation in a survey.
No thanks.