WJR2525T

Video

WJR2525/WJR4025 Starting Engine
02:15
WJR2525/WJR4025 Spraying
04:30

Slideshow

Pre-operation Check 1 (Engine Oil) 5 pages 1.66 MB
Pre-operation Check 2 (Fuel level) 7 pages 1.86 MB
Pre-operation Check 3 (Air Cleaner) 7 pages 2.45 MB
Pre-operation Check 4 (Throttle Cable) 9 pages 3.09 MB
Pre-operation Check 5 (Pump Oil) 3 pages 1.20 MB
Pre-operation Check 6 (Nozzle) 4 pages 1.17 MB
Filling Agricultural Chemicals 8 pages 2.13 MB
Check Leaking 4 pages 1.17 MB
Pump Grease Supply 11 pages 4.97 MB
After Operation 12 pages 3.75 MB
×
To provide you with better content, we would appreciate your cooperation in a survey.
No thanks.